Monday, 8 December 2008

Quarry Bank House - Gardens at Styal 30 Nov 08

Eight voluteers turned out on a frosty misty morning and spent the day with two bonfires, grubbing out and burning the remains of a group for cherry suckers that had grown up in the corner of the old orchard. Heavy work but it kept us warm.

Friday, 28 November 2008

Shugborough 23 November 2008

Six volunteers made the one-hour journey to Shugborough, the ancestral home of the Earls of Lichfield, for a workday in the walled garden annexe. We worked with a National Trust archaeologist and 14 of the volunteers from the Wolverhampton group.

We spent the day clearing the garden of scrub (alder saplings, ferns and brambles) and burning the debris. Many hands made light work and we cleared a large area. The damp vegetation burned with difficulty and often the garden was thick with smoke.
Once the scrub clearance has been completed the garden staff will keep regrowth in check so that our efforts don't go to waste. If Lottery money is obtained the aim is to restore the garden to how it looked in 1805 by restoring the mushroom pits and rebuilding the greenhouses. With luck our efforts on Sunday will be the start of a multi-year project similar to the restoration of the pineapple greenhouses in Tatton that we helped complete last year.

Thanks to Daniel for the photographs and text

Monday, 17 November 2008

16 Nov Dunham Massey


photo showing some of lastyears work before we started this years hedging

Over 10 volunteers turned out to Dunham Massey and spent a beautiful day hedge laying. The section done last year (some of which is visible in the left of the first photo) was looking good and had grown in the time since we saw it last.
photo of untouched hedge

While not strictly before and after photos of a single piece of hedge the pictures give an idea of the stages the hedge goes through. The untouched hedge is overgrown at the top, & has gaps at the bottom. The gaps don't show due to the view point of the photograph - at this site if you stand back and admire your work you are likely to get run over!
photo of hedge prepared for layingExcess material is cut from the sides of the hedge, and thinned from between the plants so that we can get to base and work on the individual plants. photo of hedge laying - more or less completed
Each plant is cut part through and folded "pleached" to create a dense barrier - this does not kill the plants and has an effect similar to coppicing - rejuvinated the hedge allowing the same plants to live for far longer than if left alone and making the hedge a better habitat for some of our wildlife.

Monday, 10 November 2008

Hare Hill 9/11/8

Muddy water in 8 inch clay pipe about 2 feet downFour of the usual suspects turned out on Sunday to investigate and perform maintenance on the network of culverts, and field drains that the Victorians installed under the parkland around Hare Hill Garden.

The area was originally boggy ground - and was drained to create grazing parkland. The slope from the highest point to the lowest is less than 1 degree - the system is an engineering marvel to work at all. The problem with the small slope is that the water flows slowly so it doesn't clean mud out of the system. After over 100 years of neglect the accumulated mud in parts of the network caused blockages, Volunteers digging for drains during a period of better weathersome of the land flooded and trees started to die.

So now the staff with volunteer help are gradually finding the drains and clearing the accumulated mud....

The weather was mixed and the work muddy, but we enjoyed ourselves - stopping for a silence at 11am.

We opened the system at five points, and cleared the accumulated silt between those points using drain rods.

Tuesday, 4 November 2008

2 November at Biddulph Grange

6 turned out to Biddulph Grange - braving a poor weather forcast.

The fire went well and the Rhodi fell.

The weather was overcast but we felt little or nor rain.

Staff were pleased - we cleared a section of Rhodi that was on the right of the Wellantonia Avenue as you look up the hill towards the country park.

Tuesday, 28 October 2008

Snowdonia Marathon

Another week where I have not been out with the group - thanks to Daniel for text and photo.
On Saturday 25th October 14 of us helped marshall the Snowdonia Marathon, an important fundraiser for the National Trust in the region. This is always a popular weekend and some of us have helped out for ten years or more! During the first part of the race we worked in three groups: two directed traffic at the Pen-y-Gwryd hotel road junction (4.5 miles), six manned the Bryn Gwynant feedstation (8 miles) and six manned the Llyn Dinas feedstation (10.5 miles). Cameramen from S4C (the Welsh language public service broadcaster) were in attendance to capture footage for Saturday evening's news and a one-hour marathon programme on Sunday.

After we had handed out the water, orange squash and jelly beans we drove back to Llanberis where most of us spent the afternoon directing runners through the town to the finish. The lucky ones had jobs in the warm dry community hall wrapping runners in foil sheets and returning kit bags.

The weather throughout the race varied from bad to atrocious and it is a testament to the hardiness and stamina of the runners that approximately 1500 completed the gruelling 26.2 mile course. The winner finished in a remarkable 2 hours 44 minutes and the last person crossed the line over four hours later.

Our accommodation for the weekend was the luxurious Hendre Isaf basecamp on the outskirts of Betws-y-coed. The piping hot showers warmed us on our return and the drying room did a great job of drying everyone's waterproofs, clothing and boots. The kitchen had ample facilities and we enjoyed a Saturday night supper of roast vegetables with pasta followed by apple & blackberry crumble with custard.

The weather had brightened up by Sunday morning and fortified by bacon and egg muffins we walked to Swallow Falls. They were spectacular after the heavy rains and the white water thundering through the gorge was a sight to behold.

PS - Daniel and Patrick have made a pact to run the 2009 Snowdonia Marathon. Watch this space for details of their training progress!

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

The photo attached shows the leading runners at 10.5 miles. The runner on the far left (2) went on to win by 13 seconds from the runner on the right (1114)).

Sunday, 19 October 2008

Holiday Catch up

I've had a weeks holiday in Yorkshire putting down a path, and sorting out ditches...

In my absence the group has had two sundays out -5th October -Rhodi Bashing in Lyme park, and 12 October Rhodi Bashing at Dunham Massey (near the golf course).

The group at Lyme had a good view of the some of the Lyme park deer including a couple of spectacular stags.

The group as a whole has also been organising social events - including a cylce ride and a bowling evening.