We had a decent day's weather and by the time we packed up at 3pm had laid 10 metres of hedge. The technique is to trim the vertical trees, nick their trunks at the base then carefully bend the trunks, weave the lain trunks together and pin them in place with stakes. We laid the hedge uphill to match the other section of hedge laid by another group last week.
The ground on the near side of the hedge was a quagmire in places and it was essential we all wore wellies. It would have been impossible to work without them. We had our tea breaks beside the cars because they were close by and the field was so wet.
Neil and Adrian persevered all morning trying to light a bonfire to burn our prunings but could not get it to catch. They stopped trying after lunch and from then on piled our cuttings neatly beside the fire site ready for the next volunteer group to burn.
Daniel’s Christmas tree chocolate cake was demolished at elevenses. He took a photo with it before it disappeared: