

We started the day by "shovelling slop off the path" - to quote Tim - and wheelbarrowing it to one side. Next we dug a drainage ditch across the path and finished by edging the path with two large beech logs. In due course the edges of the path will be defined with more logs/fencing and the path surfaced with stone chips.
At 2 o'clock the heavens opened and we had a torrential downpour for 30 minutes. It didn't dampen our spirits too much and we saw proof positive that our drainage channel worked!
No comments:
Post a Comment